Project Title: Rio Tinto – HD4

Lang Hancock Rail Extension, Mainline and Junction

HD4 – Sites: Lang Hancock Rail Extension, Mainline and Junction

Client:

Ansaldo STS
Duration/Year:

Started October 2012 - Ongoing
Project Value:

$2.4 million
Scope:

  • Correlation of existing infrastructure
  • Earth resistivity testing
  • Cable termination for all equipment
  • Point-to-point testing
  • Cable hauling
  • Installation of Dragging Equipment Detectors (DED)
  • Install/testing of Stream Flow Detectors. (SFD)
  • Construction of trenching, pit and pipe
  • Installation of underbores
  • Installation of concrete pads and culverts
  • Installation of earthing including earth grid and equipment
  • Installation of all required signage