Project Title: BHP Nelson Point Fuel Upgrade

BHP Nelson Point

SDR was the main contractor for the construction of the two, 17.5 megalitre diesel fuel storage tanks plus the installation of five kilometres of large-diameter fuel and potable water pipelines, pumping stations, road and rail load-outs, and all civil, firefighting and electrical and instrumentation works.

Client:

SDR Australia
Duration/Year:

2010
Project Value:

$1.2 million
Scope:

  • Underboring and installation of steel sleeves for the provision of the fuel line.
Technical Highlights:

  • Working in tight areas of access
  • Using our drill rigs to the limits of their capabilities
  • Designed and built specialised reamers for the task